Proper compaction around CSP is important. A vibratory compactor is the compaction equipment of choice for multiple pipe installations.
Apple iPhone 7 Plus
20
Edit
Apple iPhone 7 Plus
20

Category:

Construction & Installation

Description:

Proper compaction around CSP is important. A vibratory compactor is the compaction equipment of choice for multiple pipe installations.

Name:

Robert G (Bob) Moore

Save
Steel Structural Tunnel Liner Plate was specified by Minnesota DOT to reline twin 10' X 10' reinforced concrete box culverts. The project was in St Peter, MN on TH 22. An arch shape on steel channels was used for relining instead of round pipe. The invert of the culvert could not be raised so a hot dip galvanized horseshoe shaped arched was used to maximum the flow and not raise the invert elevation of the culvert. The culvert invert could not be raised as it would affect the hydraulics of the culvert. The entire project was constructed without disrupting any traffic. A new concrete headwall was poured around the plate arch to finish construction of the culvert.
During the construction of a new Steel Structural Plate culvert for the US Forest Service in UP of Michigan, a black bear visited the site providing important instructions on proper installation.
This 132" Corrugated Steel Pipe crane tower enclosure was used for the construction of a high rise building in downtown Minneapolis. CSP crane tower enclosers are a stay in place enclosure that allows for the crane to be placed at basement level. During the building construction process, fill is brought up around the pipe to final ground surface elevation. After the project, the crane can be disassembled from inside the pipe enclosure. After the crane is removed the CSP is filled with compacted soil. CSP played a vital role in the construction of the high rise building.
The new Mosque Foundation in Bridgeview, IL required underground storage to meet local permitting requirements in Cook County, IL (MWRDGC). Two CMP Detention Systems (54" - shown and 30" diameter) were chosen for their structural capacity, design flexibility and economics. In the photo above, the 54" systems sits between the larger of two buildings and the western property line and is connected to vast array of 54" CMP between the two buildings on site. The two systems provided a total storage of 61,807 CF.
The City of Bloomington, MN called for an underground detention system to be installed under a green space.  The pipe was 144" solid 10-gage Aluminized Steel Pipe with 24" wide corrugated levee bands and 24" wide flat gaskets to provide for a tight-fitting band connection.What makes this large pipe installation fall under the sustainability category, is native coarse sand, meeting ASTM Class II material, was used as backfill.  No special backfill was needed to be imported onto the project site.  This saved the owner a substantial amount of tax dollars as well as saved several transportation trucks that would have been otherwise needed to haul off existing fill and bring in select fill.
A failing reinforced concrete box culvert needed rehabilitation. This central Iowa county chose Corrugated Steel Pipe as the answer to the problem. 64" inside diameter pipe was used to maximum the flow of the water while still allowing enough room to back grout the new pipe. Corrugated Steel Pipe can be manufactured in any pipe diameter because it is not extruded list plastic pipe or cast is set forms like concrete pipe. This allows for the most hydraulically efficient reline pipe for inlet flow culverts. The inlet and outlet of the culvert have new steel end sections as a cost-effective end treatment.

This is "General text on entry landing page after an activated entry", is only visible on an entry landing page of an entry and can be configured for every cg_gallery shortcode type in "Edit options" >>> "Entry view"
NOTE:the cg_gallery... shortcode with entry_id added to this page can be placed on any other of your pages
NOTE: social media share icons can be configured in "Edit options" >>> "Entry view"
NOTE: "Back to gallery button custom URL" can be configured in "Edit options" >>> "Entry view"