This is "General text on entry landing page before an activated entry", is only visible on an entry landing page of an entry and can be configured for every cg_gallery shortcode type in "Edit options" >>> "Entry view"
NOTE:the cg_gallery... shortcode with entry_id added to this page can be placed on any other of your pages
NOTE: social media share icons can be configured in "Edit options" >>> "Entry view"
NOTE: "Back to gallery button custom URL" can be configured in "Edit options" >>> "Entry view"

21 - 27
of
27
Photo contest ist over
Photo contest ist over
Tripod laser level used for layout of cut lines for fabrication of 84” Fully Perforated Polymer Coated Metal Pipe.
Apple iPhone SE (2nd generation)
f/1.8
1/31
400
3mm
Edit
Apple iPhone SE (2nd generation)
f/1.8
1/31
400
3mm

Category:

Manufacturing & Fabrication

Description:

Tripod laser level used for layout of cut lines for fabrication of 84” Fully Perforated Polymer Coated Metal Pipe.

Name:

Tim Hahn

Save
This was a replacement for a 3 span bridge constructed in 1936. The Buried Bridge was selected to meet rail clearance requirements as well as provide a signature look for the community. The structure was designed to be built in an accelerated time frame, using precast concrete footings, modular assembly (structure was assembled in 2.5 days), and mechanically stabilized earth (MSE) headwalls. An architectural committee for the town decided to stain the precast panel faced MSE headwalls to match natural granite in the area and a decorative railing resembling the look of the original bridge was installed along the roadway.
The project consisted of redevelopment of the El Toro Marine base in Irvine, CA. The City wanted to preserve some of the history of the base and incorporate features into the new construction. Much of the original runway was recycled as fill materials, park benches, and other features. Development of the greenway included a pedestrian path that crossed below several new roads, including 4 underpass buried bridges. There was a desire to find a structure type that resembled the arched look of the blimp hangars from El Toro and accommodate lighting & other features to enhance the safety and aesthetics of the path. The 4 crossings provided a signature look for the park, were well received by the public, and are truly green. The galvanized steel structures include 90% + recycled materials and were backfilled with recycled fill from the concrete runways. This fit in with stainability goals of the project. The path includes park benches constructed from portions of the El Toro runways.
Temporary use of aluminized 12’ diameter arch pipe installed in a causeway enabling sand dune restoration.
30" Diameter corrugated metal pipe planters. Powder coated to enhance shine!
Blue light (L.E.D) added in foreground at night to enhance what is already a photogenic product; perforated corrugated metal pipe.
The photo shows the finished product of an end treatment for a double run of 48" CMPs which were installed too close together to install normal flared ends.  After receiving the dimension between the culverts, a custom double end section was manufactured to solve the issue.  The customer also wanted to prevent debris from entering the culverts.  A double trash guard was fabricated and fitted to the double end section.

This is "General text on entry landing page after an activated entry", is only visible on an entry landing page of an entry and can be configured for every cg_gallery shortcode type in "Edit options" >>> "Entry view"
NOTE:the cg_gallery... shortcode with entry_id added to this page can be placed on any other of your pages
NOTE: social media share icons can be configured in "Edit options" >>> "Entry view"
NOTE: "Back to gallery button custom URL" can be configured in "Edit options" >>> "Entry view"